Home of Gulf Coast Aviation Flight School

Gulf Coast Aviation Flight School

  • Home
  • Flight Training
    • Private Pilot
    • Instrument Rating
    • Commercial Certificate
    • Multi-Engine Rating
    • Flight Instructor Certificate
      • Flight Instructor Instrument Certificate
      • Multi-Engine Flight Instructor Rating
    • Training Timelines
    • Financing
    • VA Benefits
  • Aircraft
    • N1092A (C172)
    • N2473Z (C172)
    • N65331 (C172)
    • N65447 (C172)
    • N469ER (C172)
    • N43WW (Saratoga)
    • N4462S (Baron)
    • NSIM
  • Liberty University
  • Community
    • Events Calendar
    • Links
  • Shop
    • Gifts
  • FAA Testing Center
  • Schedule
  • Contact Page
    • Staff
    • Locations
    • Career
You are here: Home / Archives for KNEW Info

Aug 21 2015

VIP Notice

VIP Notice- New Orleans, LA
Notice Number: NOTC6148

Notice: Expect VIP movement August 27, 2015 in the vicinity of New Orleans, LA.  Pilots can expect airspace restrictions in conjunction with this VIP movement.  The FAA recommends that all aircraft operators check NOTAMs OFTEN for  mandatory airspace restrictions prior to operations within this region.

Specific instructions and restrictions are available at http://tfr.faa.gov once the NOTAM has been issued.

*Depicted TFR data may not be a complete listing. Pilots should not use the information on this website for flight planning purposes. For the latest information, call your local Flight Service Station at 1-800-WX-BRIEF.

Written by admin · Categorized: KNEW Info

Aug 19 2015

Ramp Repair Project – Status

From KNEW Operations 2015-08-17: The contractor began the ramp repair project this morning on Sites A, B, and C. The estimated impact of this project is approximately 5-7 days, depending on weather.

All areas mentioned above were barricaded, flagged and lighted. All NOTAMS were issued to reflect the three work sites (Site A, B and C) until Tuesday, August 25th at 2200Z (reference NOTAM #08/025 for Site A, #08/023 for Site B, and #08/022 for Site C).

Saw cutting and some demolition began on Site A; the site will be completely excavated tomorrow with the plan to have both Site B and C completed by 1700L tomorrow (August 18th) or by COB on August 19th. The contractors were advised to have Site A poured first, if possible and then proceed with Site B and C. Saw cutting also began on Site C and should be completed by COB tomorrow (August 18th). The plan is to begin pouring concrete at all three sites by this Thursday or Friday.

All men and equipment are done for the day and will resume work tomorrow between 1230Z and 1300Z. The saw-cutting machine has been left inside the perimeter for Site A (pictured below) with a flag and light attached (indicated via the NOTAM referenced above).

ARFF will ensure all lights are in working order and the flags/barricades remain in place.

IMPORTANT:
In an effort to prevent possible damage or destruction of the work site, please be mindful of how aircraft are marshalled into the ramp area where the work sites are barricaded. Site C is located approximately 50FT from the taxiway centerline, which is south of the southern edge line of the taxiway.

ramp repair a
ramp repair b
ramp repair c
ramp repair d

Written by admin · Categorized: KNEW Info

Aug 13 2015

East Ramp (“Ball Park”) Closure

From the Airport:

The East Ramp, often referred to as the “Ball Park”, will be closed beginning tomorrow morning, August 13th at 0700L until Tuesday, August 18th at 2000L due to filming. The producer of the film was advised that the entrance to the ramp from the active taxiway will need to be properly barricaded with lights.

Please ensure all aircraft who park on the East Ramp/Ball Park are relocated prior to the closure beginning at 0700L tomorrow morning. It is preferred that aircraft park elsewhere as the closure will commence on time.

A NOTAM has been issued to reflect this closure: NEW 08/015 NEW APRON BALL PARK RAMP CLSD 1508131200-1508190100

Written by admin · Categorized: KNEW Info

Jun 03 2015

Closure/Work on Taxiway Foxtrot

From KNEW Operations:

Once again we will be scheduling work on the taxiway project. This will take care of items on the “punch list” for the recent taxiway rejuvenation project. Taxiway Foxtrot between Runway 36L and Taxiway Golf, and Taxiway Bravo between Taxiway Golf and Taxiway Foxtrot will be closed from 8:00am Wednesday June 3, 2015 and Friday, June 5, 2015. This is similar to the closure during the recent taxiway project. Sorry for any inconvenience but the work must be accomplished. More closures will follow as the work progresses and I will keep you informed.

Written by admin · Categorized: KNEW Info

Feb 07 2015

KNEW PAPI Updates

The latest information on the PAPI system is that the FAA is waiting on a removable system to be approved for use. They do not have a timeframe for when that will happen. This information came from The FAA office in Ft Worth. The local person in charge of the PAPI’s is waiting on approval to move forward. He has been instructed by the airport to put the 18R system in first.

Written by admin · Categorized: KNEW Info

Jan 31 2015

Taxiway Sealcoat Project

From the Airport Operations Manager:

The taxiway crack seal/sealcoat project is moving along as planned.   The schedule as we know it right now is:

  1. Friday, Jan 30, 2015, and Saturday, Jan 31, 2015:  Sections of Taxiway Foxtrot in front of Landmark and Flightline First are being prepped and sealcoated, arranged so that Landmark can get in and out via Taxiway Bravo (F closed from just east of B to Taxiway G) and Flightline First can get in and out to the west (F closed from Flightline First mid ramp to halfway across the Bastian Mitchell ramp).  Everyone should have access to their ramps from one side or the other.
  2. The terminal ramp will be closed on Monday, February 2, 2015 and Tuesday, February 3, 2015.  Please do not park any aircraft on the terminal ramp these days as there will be a movie shoot there.  Please note that this is a change from the previous plans for Sunday and Monday.
  3. Monday, Feb 2, 2015:  Sealcoat prep and work will continue on portions of Taxiway Foxtrot provided the previous sections of  F are finished and open.  Everyone will still have access to their ramps from one side or the other.  We will make every attempt to keep you advised of the latest progress.

Thank you all, in advance, for your cooperation in getting our taxiways rejuvenated, which will prolong the life of the pavement and our airport.

Written by admin · Categorized: KNEW Info

Jan 31 2015

Terminal Ramp Closure

From the KNEW Airport Operations Manager:
The Terminal Ramp will be closed on Sunday, February 1, 2015 and Monday, February 2, 2015 for a movie shoot. Please make sure that no aircraft are parked on the terminal ramp these days.

Ground traffic will be re-routed as necessary.

Written by admin · Categorized: KNEW Info

Contact Us:

Gulf Coast Aviation
New Orleans
New Orleans Lakefront Airport
6401 Stars and Stripes Blvd
Guard Hangar
New Orleans, LA 70126

Baton Rouge
Baton Rouge Metro Airport
4421 Chuck Yeager Ave.
Baton Rouge, LA 70807

Stennis
Stennis International Airport
7256 Stennis Airport Dr. Ste 102
Kiln, MS 39556

Call us: 504-246-2700 (New Orleans)
225-357-5556 (Baton Rouge)
228-463-3199 (Stennis)

Email us: info@gulfcoastaviation.com (New Orleans)
kbtr@gulfcoastaviation.com (Baton Rouge)
khsa@gulfcoastaviation.com (Stennis)

© 2023 · Home Page · Gulf Coast Aviation Flight School